Projects
Charing Cross Road
Lynch was selected to work alongside Cantillon for the removal of Inert Muck Away from the former Foyles book shop on the Charing Cross Road. The job commenced on the 16th July 2018 and the last load was removed on the 13th April 2019. During these ...
Projects
HS2 Euston
July 2019 marked one year since Lynch commenced haulage on the HS2 project at Euston and to celebrate this anniversary our haulage team have managed to compile the following key facts shown below from the project to date: 4,595 lorry movements 475 ...
Projects
A14 Huntingdon to Cambridge
Provided daywork tippers and Grab Lorries on this infrastructure project, moving site won materials from various compounds to the onsite disposal sites, as well as moving aggregates around the sites, and utilising the grab lorries to place the materi...
Projects
Thames Tideway
Removed Hazardous and Non-Hazardous waste form the site preparation at Greenwich Pumping Station. Supplied aggregates to various sites including Tilbury and Northfleet. Worked alongside the principle contractor at Kirtling Street providing daywor...
Projects
Battersea Power Station
Removed over 500 loads from site. All lorries were compliant and had to follow strict traffic routes....
Projects
Embassy Gardens, Nine Elms
Removed over 1000 loads of Inert Muck from this site. Utilising this facility ensured quick turnaround times, and helped to ensure the project was completed on time....
Projects
Thames Water
Range of services carried out across the Olympic Park, providing Day Work Lorries and Muck Away on site. Utilised role of Operator Foreman to ensure that all of our onsite drivers were supported to ensure the project was carried out to specification....
Projects
Bicester East West Rail Link
Provided daywork tippers and Road sweeper’s on this infrastructure project, moving site won materials from various compounds to the onsite disposal sites....
Projects
M1 Jct 19
Utilised Grab Lorries on a day work basis on this project, all drivers had to be site inducted and hold a Critical Medical Certificate. Provided Lorries on a 24/7 rolling shift basis working alongside the principle contractor’s requirements....